Starting Point Formulation · REC20051

Two-Component Waterborne Epoxy Anti-Corrosion Primer, Grey – Rail Applications

Based on Beckopox™ EP 386w/52WA & Beckopox EH 613w/80WA

REC20051 is a starting-point formulation for a two-component (2K), water-reducible grey epoxy anti-corrosion primer for Rail applications, designed for sand-blasted steel, thin film (50–70 µm) and low VOC. It pairs the allnex Beckopox™ EP 386w/52WA waterborne epoxy resin with the Beckopox EH 613w/80WA amine hardener.

  • ~63%Solids A+B
  • ~90VOC g/L
  • ~31%PVC
  • ~19.1Mileage m²/L
  • ~2 hPot life 23°C

Formulation

Composition by weight (parts). Part A is built in stages I–III and pearl-milled, then combined with Part B before use.
Raw material Weight Function Supplier
Part A – Stage I
Beckopox EP 386w/52WA44.50Epoxy resinallnex
Additol® VXW 6208/601.50Dispersing additiveallnex
Additol VXW 63930.40Defoamerallnex
Deionized water10.50
Methoxypropanol0.80Co-solvent
Part A – Stage II
Microtalc IT extra5.30FillerElementis
Kronos 219019.90PigmentKronos
Plastorit 00006.20FillerImerys
Bayferrox 39200.25PigmentLanxess
Bayferrox 3060.75PigmentLanxess
Baryt EWO4.30FillerDeutsche Baryt Industrie
Heucophos ZPO4.30Anti-corrosionHeubach
Part A – Stage III
Texanol Ester Alcohol0.80Coalescent solventEastman
Additol VXW 63880.80Rheology controlallnex
Total Part A100.00
Part B
Beckopox EH 613w/80WA5.20Amine hardenerallnex
Deionized water5.20

Combine the two components only shortly before application and adjust the viscosity with deionized water. Previous reference: HS17/4BZ.

Processing

  1. Pre-mix stage A-I and add pigments / fillers Mix Part A-I in the mentioned order. Add pigments and fillers (Part A-II) and disperse on a dissolver for 10 min at 7–8 m/s.
  2. Pearl-mill the mill base Disperse the mixture of parts 1 and 2 on the pearl mill with zirconium oxide pearls (1 mm) for 30 min at 7–8 m/s. The mill base temperature should not exceed 40 °C. Complete with the components of Part A-III.
  3. Combine the two components and apply Mix Part A and Part B shortly before application and adjust the viscosity with deionized water.

Calculated parameters

Solids content, Part A
approx. 66 %
Solids content, Part A + Part B
approx. 63 %
Amine / epoxy crosslink ratio
approx. 0.8 / 1
Pigment / binder ratio
approx. 1.5 / 1
Pigment volume concentration
approx. 31 %
Mileage (25 µm dry film thickness)
approx. 19.1 m²/liter
VOC content
approx. 90 g/l (excluding water)

Measured parameters (test results)

Test results REC20051: two-component epoxy anti-corrosion primer, grey, for Rail applications.
Feature Method Unit Result
Dynamic viscosity (23 °C), Part AISO 3219 (25 s⁻¹)mPa·sapprox. 2800
Dynamic viscosity (23 °C), Part A + BISO 3219 (25 s⁻¹)mPa·sapprox. 3500
Pot life (23 °C)VLN 267 *hoursapprox. 2
Applied on cold rolled steel, approx. 49 µm dry film thickness
Pendulum damping after 7 days room temperatureISO 1522s59
Cupping – indentationISO 1520mm5.7
Impact resistance, directASTM D-2794i/p40
Impact resistance, reverseASTM D-2794i/p10
Applied on Gardobond OC, 45–50 µm dry film thickness
Resistance to tropical conditions after 999 hoursVLN 147 **blistering degreem0g0

* VLN 267 is an allnex internal test method for measuring pot life / processing time of aqueous two-component epoxy systems. ** VLN 147 is similar to DIN EN ISO 6270-2:2005-09.